$10/mo for tradies.Get Verified
Cost guide · Dunedin

Rewire a House cost in Dunedin (2026)

Typical Dunedin range

$8,000$69,000

Most Dunedin projects land around $17,000$29,000. Prices run near the national average.

Why Dunedin differs

Dunedin runs a little below the national average, but hill suburbs add retaining and the colder H1 climate zone lifts the insulation spec.

Usually included

  • Removal of old wiring (where accessible)
  • New wiring throughout (modern TPS cable)
  • New switchboard with RCD/MCB
  • Standard outlets and light switches
  • Standard light points
  • Certificate of Compliance

Usually excluded

  • Lighting fixtures (homeowner supplies)
  • Making good plaster damage
  • Repainting
  • Data / network cabling unless requested
  • EV charger (separate quote)
  • Multi-room speaker wiring

Usually no building consent needed

Rewiring an existing house doesn't usually need a building consent. The electrician must issue an Electrical Certificate of Compliance for the work. Adding new structural penetrations or significant changes may need consent.

See 152 Builders on the register in Dunedin

Questions to ask before you sign

  • Are you replacing the switchboard? Recommended for any pre-2000 house.
  • How many outlets and points are included?
  • Will you issue an Electrical Certificate of Compliance and Electrical Safety Certificate if needed?
  • Who patches the GIB after the cables run?
  • What's the warranty on the install?

Dunedin rewire a house: common questions

When does a house need a rewire?
Pre-1970s houses on original wiring usually do — old insulation degrades, no earthing, no RCD protection. 1980s-90s houses with VIR or rubber-insulated wiring also benefit. Houses post-2000 rarely need a full rewire unless damaged.
Can I do a rewire myself in NZ?
No — almost all rewire work is prescribed electrical work requiring a licensed electrician. A homeowner can plan and arrange, but the actual wiring must be done by an EWRB-registered person who issues the Certificate of Compliance.

Before you pay anyone, check who they are.

Check the company that quoted you: company status, registration and what's on the public record, from the official NZ sources.

Check a builder

Actually starting this build? Keep watch on your builder for the whole build →

Related

Figures are 2026 estimates for guidance only, not a quote. Actual cost depends on your site, spec and the company you choose. Always get written quotes and check the company on the public record before you pay a deposit.