$180/m²

A lay a concrete driveway in New Zealand typically costs around $180/m² per m², ranging from $120/m² for a budget job to $400/m²+ at the premium end. The figures below break down what each level gets you, what drives the price, and how it varies by region.

Got a builder in mind for this? Check them before you pay a deposit.

Check a builder

Lay a Concrete Driveway cost by level

Budget

$120/m² – $160/m²

Plain concrete, single driveway (~30-50 m²), straightforward subgrade, no major drainage.

Mid-range

$160/m² – $240/m²

Exposed aggregate or coloured concrete, double driveway, edge detailing, sealed.

Premium

$240/m² – $400/m²

Large, complex layout, stamped or stencilled patterns, premium sealing, integrated lighting or drainage.

What changes the price

FactorImpactWhy
Subgrade condition+30-80%Soft, clay or peat ground needs aggregate base or geotech-engineered preparation.
Slope+15-25%Steep driveways need stepped pours, anti-skid finish, sometimes retaining.
Drainage and crossover$2-10kConnection to council stormwater, channels across driveway, kerb cuts.
Finish type+30-100%Plain cheapest; aggregate, stencil, stamp progressively more.

Lay a Concrete Driveway cost by region

Indicative per-m² rates based on the typical figure, adjusted for regional labour and material differences.

Auckland

$200/m²

Wellington

$190/m²

Christchurch

$170/m²

Hamilton

$170/m²

Tauranga

$180/m²

Regional NZ

$170/m²

What's usually included, and what isn't

Usually included

  • Subgrade preparation
  • Steel mesh reinforcement (standard)
  • Concrete pour and finish
  • Edge detail
  • Curing

Usually extra

  • Demolition of existing driveway
  • Crossover modification (council fees)
  • Stormwater connections
  • Retaining walls
  • Resource consent if heritage zone
  • Border features (stones, planting)

Typical timeline

37 days

Building consent

Not usually required

Most driveway replacements don't need a building consent. New driveway crossovers to a council road do require council approval (separate from building consent) — there's an application form and a fee.

Before you pay a deposit

A lay a concrete driveway is one of the biggest cheques you'll write.

Before you hand over a deposit, it's worth knowing the company is real, still trading, and what's on the public record. We pull the Companies Office, the NZ Gazette insolvency notices, the Licensed Building Practitioners register and 30+ other official sources into one plain check. Takes about a minute.

Check a builder No account, results in minutes.

Questions to ask before you sign

  • What concrete strength (MPa)? 20 MPa minimum, 25-30 MPa standard for residential.
  • What reinforcement — steel mesh, rebar?
  • How thick — 100mm minimum, 125-150mm if vehicle bigger than a car?
  • Sealing included? Coloured and exposed aggregate need sealing.

Find registered trades near you

Ready to get quotes? Browse registered lay a concrete driveway trades by city, then run a background check on each one before you sign.

Frequently asked questions

How long should a concrete driveway last in NZ?
Properly installed concrete driveway lasts 30-50 years with light maintenance. Major repairs needed only if subgrade fails or reinforcement corrodes (rare with steel mesh).
Concrete vs asphalt driveway in NZ?
Concrete: longer lifespan (30-50 years vs asphalt's 15-25), better appearance, higher upfront. Asphalt: faster install, easier repair, lower upfront. Concrete is more common on residential driveways.

Lay a Concrete Driveway costs by city

Related cost guides